Solutions
Quality checked, approved on site
Our engineers check specifications, tolerances and quality, with quality control applied throughout the project lifecycle.
The challenge
Cleared through customs is not the same as verified
Components that are cleared through customs but not verified for the specification, tolerances and quality the site needs put the project at risk. Our responsibility does not end at customs clearance.
What is included
What you get

Specification and tolerance checks

Quality control throughout the project lifecycle

On-site inspection and approval of components

Verification of corrosion protection (e.g. cathodic protection systems)
How it works
From specification to approval
Step 01 of 04
Verify specifications
Our engineers check specifications and tolerances against the project requirements.
Step 02 of 04
Control quality
Quality control is applied throughout the project lifecycle.
Step 03 of 04
Inspect on site
Components are inspected on site.
Step 04 of 04
Approve
Components are approved on site before they enter the client’s infrastructure.





Example project
Corrosion protection verified on a 19 km pipeline
Water · North Jeddah. Al-Aziziyyah Water Transmission System: we sourced pipe, fittings and cathodic protection, and quality-verified the corrosion protection, for a 16-inch coated carbon-steel pipeline of about 19 km.