Services
Made by selected factories, witnessed by our engineers
We place each product with a factory selected for it, witness its acceptance tests, and are bringing assembly and manufacturing into Saudi Arabia.
What is included
How we manufacture

Selected Chinese factories for each product
Each product made by a factory chosen for that product.

International brands made in China
Products of international brands, made in China.

Factory acceptance tests (FAT)
Witnessed by our engineers before shipment.

Assembly and manufacturing in Saudi Arabia
Road mapOn our road map: SKD assembly from 2028, CKD from 2029, local manufacturing in 2030.
Road map
From sourcing to making.
- 2026
Today
Sourcing & logistics
Sourcing through our Beijing base, quality-checked by our engineers.
- 2027
PlannedPhase 1
Distribution & service centre
The first step beyond sourcing and logistics: distribution and service for the equipment we supply.
- 2028
PlannedPhase 2
Local SKD assembly
Products arrive partly built and are completed in Saudi Arabia.
- 2029
PlannedPhase 2
Scale-up and CKD assembly
Assembly scales up and CKD starts: building products from separate parts.
- 2030
PlannedPhase 3
Local manufacturing (CKD)
Saudi teams manufacture components in the Kingdom, checked against the approved drawing.
- 2031
PlannedPhase 4
Local manufacturing + export
Saudi-made products exported from the Kingdom.
Technology transfer
How a product moves from a partner’s factory to a Saudi line
Seven steps take a product from selection to a Saudi team, and Saudi suppliers, that can make it.
Step 01 of 07
Start with equipment the projects actually need
We review the expected demand, the product drawings and the Saudi production capabilities available before selecting the first component. The choice has to make sense both on the factory floor and in the buyer’s procurement plan.
Before the first shipment, Hasin and the manufacturing partner agree which drawings the Saudi team can use, who teaches the first production lead and who approves a change. Each stage has a named owner, a deliverable and an agreed way to judge the result.
Step 02 of 07
Learn where the product is already made
At the partner’s factory in China, the Saudi production lead works alongside the engineer responsible for the selected operation: observing a production run, setting up the next one and inspecting the finished part.
An important part of the handover is learning what an experienced operator notices when the process starts to go wrong, and what to adjust before the next part is made.
Step 03 of 07
Use the first builds to prepare for local manufacture
Saudi assembly gives the team a working understanding of how the product fits together. During the first builds from kits, technicians record fit issues, test results and the operations that still need support from the original manufacturer.
Those findings decide the tooling, training and inspection methods for the first locally made component. SKD assembly is planned from 2028 and CKD assembly from 2029.
Step 04 of 07
Everything a Saudi team needs to make the part
A drawing tells an engineer what the finished part should look like. Producing it also takes the material specification, the sequence of operations, the tooling and a way to check the result.
For the selected component, we define the engineering documents and shop-floor instructions the Saudi team needs, in a language its operators can use. Then the team makes the first part to the approved drawing.
Step 05 of 07
Agree on the test before making the part
Before fabrication begins, the engineering teams agree the dimensions, material properties and performance checks that matter, and their limits.
The part is measured against the approved drawing, then fitted and tested in the equipment it belongs to. If a result falls outside the limits, the team records the cause, corrects it and repeats the check.
Step 06 of 07
Know-how that stays in the Kingdom
One of the clearest signs that know-how has taken root is what happens after the first Saudi lead returns from training. Can that lead teach a colleague to set up the job, recognize a defect and produce another acceptable part?
A repeat production run with a second operator gives the project owner a practical answer. The handover is complete when the first Saudi lead can teach the second operator.
Step 07 of 07
Give Saudi suppliers a part they can qualify for
Localization grows beyond one line when Saudi suppliers can make parts too. A supplier receives a specific component, a drawing it is authorized to use, the expected volume and the acceptance criteria.
The supplier assesses its equipment, quotes the work and submits a sample. The project team evaluates the sample and decides whether to qualify the supplier for repeat orders.

China and Saudi Arabia
Select the product and its first part
Chosen against real demand and Saudi production capability; drawings, owners and acceptance criteria agreed up front.

China
Train with the original manufacturer
The Saudi production lead works beside the engineer who runs the operation.

Saudi Arabia
Assemble the first units in the Kingdom
Kits are built in Saudi Arabia; fit issues and test results are recorded.

Saudi Arabia
Manufacture the part in Saudi Arabia
A Saudi team makes the first part to the approved drawing.

Saudi Arabia
Check it against the drawing and in the assembly
Dimensions and material are measured against the approved drawing, then the part is tested in the equipment it belongs to.

Saudi Arabia
Repeat the build with a Saudi team
A second operator runs the process: the know-how has taken root.

Saudi Arabia
Qualify Saudi suppliers
Local suppliers receive a defined part, an authorized drawing, the volume and the tests, then qualify for repeat orders.
A first localization milestone
Local manufacturing starts with a specific part.
Take a baseplate for a pump package. Three pieces of evidence, inspected together, show it was made right in Saudi Arabia.
- 1
The approved drawing
The partner’s drawing, approved for Saudi use
Material specification, mounting points and tolerances agreed before any steel is cut.
- 2
The Saudi-made part
Cut, drilled, welded and measured in the Kingdom
A Saudi fabrication team makes the baseplate and measures every mounting point against the drawing.
- 3
The finished assembly
Fitted with the pump and motor, and tested
The buyer inspects the drawing, the measurements and the assembled equipment together.
Example: a baseplate for a pump package, the kind of first component a localization program can start with.