Water
Jeddah South Strategic Water Storage Tanks
1.05 million m³ combined storage capacity
- ClientSaudi Water Authority (SWA)
- LocationSouth Jeddah
- Years2024–2026
The challenge
Six mega ground storage reservoirs needed large-diameter valves, piping and integrated control systems to operate.
What Hasin did
Sourced and managed the procurement supply chain for the reservoirs, including large-diameter valves, piping and integrated control systems.
Result
1.05 million m³ of combined storage capacity across 6 reservoirs.
Project team
- Main contractor: Cayan Company Ltd.
More projects
Named clients. Measured scope.
Water · RiyadhAl Jubail to Riyadh Water Transmission System, Phase 3 (Packages B1 & B2)
Twin 88-inch pipelines · 1.2 million m³/day
Water · Hail, Shinan, Fayed & AjfarHail Region Water Networks
133+ km of network · 302 valves · 53 hydrants
Water · North JeddahAl-Aziziyyah Water Transmission System
≈19 km of 16-inch coated carbon-steel pipeline