Technology Transfer & Localization

From assembly to manufacturing in Saudi Arabia.

Hasin brings manufacturers in China and industrial partners in Saudi Arabia together around a specific product. We plan how that product can be assembled in the Kingdom, which components can be made here, and what the Saudi team will need to run production independently.

The question behind every proposal

What will the Saudi team be able to make?

For each product, we identify three things before anything ships.

The transfer, step by step

The 7 steps behind transferring manufacturing

Seven steps take a product from selection to a Saudi team, and Saudi suppliers, that can make it.

Step 01 of 07

Start with equipment the projects actually need

We review the expected demand, the product drawings and the Saudi production capabilities available before selecting the first component. The choice has to make sense both on the factory floor and in the buyer’s procurement plan.

Before the first shipment, Hasin and the manufacturing partner agree which drawings the Saudi team can use, who teaches the first production lead and who approves a change. Each stage has a named owner, a deliverable and an agreed way to judge the result.

Valves and pipework inside a pumping facility

Product selection

Start with equipment the project actually needs

For a water project, the starting point might be a pump package. For an energy or infrastructure project, it might be an equipment enclosure or a fabricated support.

We review the expected demand, the product drawings and the available Saudi production capabilities before selecting the first component. The choice has to make sense both on the factory floor and in the buyer’s procurement plan.

Partner responsibilities

Agree on the handover before the first shipment

Hasin settles these questions with the manufacturing partner at the outset. Each stage has a named owner, a deliverable and an agreed way to judge the result.

Engineers in safety gear discussing work on site

Engineering

What comes with the equipment

A machine drawing tells an engineer what the finished part should look like. Producing it also requires:

  • The material specification
  • The sequence of operations
  • The tooling
  • A way to check the result

For the selected component, we define the engineering documents and shop-floor instructions the Saudi team will need, in a language its operators can use.

Two engineers in hard hats walking across a sandy site

Training in China

Learn where the product is already made

At the partner’s factory in China, the Saudi production lead works alongside the engineer responsible for the selected operation: observing a production run, setting up the next one and inspecting the finished part.

An important part of the handover is learning what an experienced operator notices when the process starts to go wrong, and what to adjust before the next part is made.

Warehouse floor with pallets and marked lanes

Saudi assembly

Use the first build to prepare for local manufacture

Saudi assembly gives the team a working understanding of how the product fits together. During the first builds from completely knocked-down (CKD) kits, technicians record fit issues, test results and the operations that still need support from the original manufacturer.

Those findings decide the tooling, training and inspection methods for the first locally made component.

  • 2028 (planned): SKD assembly: products arrive partly built and are completed in Saudi Arabia.
  • 2029 (planned): CKD assembly: products arrive as separate parts and are fully built in Saudi Arabia.

A first localization milestone

From an approved drawing to a Saudi-made part

Take a baseplate for a pump package. Three pieces of evidence, inspected together, show it was made right in Saudi Arabia.

  1. 1

    The approved drawing

    The partner’s drawing, approved for Saudi use

    Material specification, mounting points and tolerances agreed before any steel is cut.

  2. 2

    The Saudi-made part

    Cut, drilled, welded and measured in the Kingdom

    A Saudi fabrication team makes the baseplate and measures every mounting point against the drawing.

  3. 3

    The finished assembly

    Fitted with the pump and motor, and tested

    The buyer inspects the drawing, the measurements and the assembled equipment together.

Example: a baseplate for a pump package, the kind of first component a localization program can start with.

Quality

Agree on the test before making the part

Before fabrication begins, the engineering teams identify the dimensions, material properties and performance checks that matter for the selected component.

Step 01 of 04

Define

Agree the dimensions, material properties and performance checks that matter, and their limits.

Skills transfer

The handover is complete when the first Saudi lead can teach the second operator.

One of the clearest signs that know-how has taken root is what happens after the first Saudi lead returns from training. Can that lead teach a colleague to set up the job, recognize a defect and produce another acceptable part? A repeat production run with a second operator gives the project owner a practical answer.

For procurement and industrial decision-makers

What you can hold the program to

Visibility

See exactly what has moved to Saudi Arabia

At each project review, a marked-up parts list, production records and inspection results show what arrived as kits, what was assembled in the Kingdom and what a Saudi team manufactured.

  • 2 Arrived as a kit
  • 3 Assembled in the Kingdom
  • 2 Made by a Saudi team
Example: a pump package at a project review
ItemStatusEvidence at the review
Pump casing and impellerArrived as a kitSupplied by the original manufacturer
Electric motorArrived as a kitSupplied by the original manufacturer
Coupling and guardAssembled in the KingdomAssembly record
Pump and motor alignmentAssembled in the KingdomAlignment check sheet
Control panelAssembled in the KingdomWired and tested in the Kingdom
BaseplateMade by a Saudi teamApproved drawing, measurements, fit test
Anchor bolts and fixingsMade by a Saudi teamLocal supplier sample, qualified

Illustrative example. The same records show where the project still depends on the original manufacturer, and what the next transfer should address.

Local suppliers

Give Saudi suppliers a part they can qualify for

With these details, a Saudi supplier can assess its equipment, quote the work and submit a sample. The project team evaluates the sample and decides whether to qualify the supplier for repeat orders.

Register as a supplier

Regional growth

From the first build to regional supply

Once a Saudi team sustains quality and delivery across repeated orders, regional supply becomes the next decision: which market needs the product, what approvals it requires, and whether the Saudi operation can support the volume, spare parts and service.

Our road map
  1. 2026

    Today

    Sourcing & logistics

    Sourcing through our Beijing base, quality-checked by our engineers.

  2. 2027

    PlannedPhase 1

    Distribution & service centre

    The first step beyond sourcing and logistics: distribution and service for the equipment we supply.

  3. 2028

    PlannedPhase 2

    Local SKD assembly

    Products arrive partly built and are completed in Saudi Arabia.

  4. 2029

    PlannedPhase 2

    Scale-up and CKD assembly

    Assembly scales up and CKD starts: building products from separate parts.

  5. 2030

    PlannedPhase 3

    Local manufacturing (CKD)

    Saudi teams manufacture components in the Kingdom, checked against the approved drawing.

  6. 2031

    PlannedPhase 4

    Local manufacturing + export

    Saudi-made products exported from the Kingdom.

Vision 2030

Why this matters to the Kingdom

In support of Saudi Vision 2030’s industrial mandate, we are bringing manufacturing know-how into Saudi industrial zones, organically and through targeted partnerships with global manufacturing technology providers.

Our clients need demonstrable alignment with Local Content and Saudization requirements. Every step above is designed to produce that evidence: Saudi technicians trained, operations moved into the Kingdom, and components made by Saudi teams and Saudi suppliers.

Partner Program

Which product should Saudi Arabia make next?

Bring us an equipment specification, a recurring purchase requirement or a component you want to source closer to your project. The first discussion focuses on where Saudi assembly can begin, which manufacturing operation could follow, and what both partners would commit to a pilot.

Saudi-made, Saudi-run, verified. Let’s choose the first product together.