
Solutions
From specification to installed asset
We deploy specialized procurement capability across Saudi Arabia’s water, energy and oil & gas sectors. Engaging early, we streamline the technical, logistical and commercial path from specification to installed asset.
What we do
Five solutions, one chain

Strategic Sourcing & Procurement
Sourcing & procurementIdentifying and engaging manufacturers through our Beijing base and global alliances, matched to each project’s specification.

Technical Verification
Technical verificationOur engineers inspect specifications, tolerances and quality, and carry responsibility through to final approval on site.

Logistics & Delivery
Logistics & deliveryManaging materials from the manufacturer into Saudi Arabia and on to site, to the project’s schedule.

Local Assembly (planned)
Our assembly planSKD assembly in Saudi Arabia planned from 2028, starting CKD in 2029.

Local Manufacturing (planned)
Our manufacturing planManufacturing in Saudi Arabia planned by 2030, and export by 2031.
How to work with us
One accountable partner, from specification to approval
We meet clients where they are: stabilizing critical component supply for operating water and power plants, or rethinking cross-border procurement end to end for new networks.
Where construction is required, we source, qualify and manage the specialist contractors who carry it out.
How it works
One corridor. One point of accountability.
Step 01 of 05
Engage
We review the project’s technical, logistical and commercial requirements early in development.
Step 02 of 05
Source
We identify and engage manufacturers through our Beijing base and our global alliances, matched to the project specification.
Step 03 of 05
Verify
Our engineers check specifications, tolerances and quality, with quality control throughout the project lifecycle.
Step 04 of 05
Move
We manage logistics from the manufacturer into Saudi Arabia, keeping materials moving to the project’s schedule.
Step 05 of 05
Approve
Components are inspected and approved on site. We take responsibility for every valve, tower and linear meter of pipeline we introduce.





Projects
Five projects. Named clients. Measured scope.
Water · South JeddahJeddah South Strategic Water Storage Tanks
1.05 million m³ combined storage capacity
Water · RiyadhAl Jubail to Riyadh Water Transmission System, Phase 3 (Packages B1 & B2)
Twin 88-inch pipelines · 1.2 million m³/day
Water · Hail, Shinan, Fayed & AjfarHail Region Water Networks
133+ km of network · 302 valves · 53 hydrants
Water · North JeddahAl-Aziziyyah Water Transmission System
≈19 km of 16-inch coated carbon-steel pipeline
Energy · Al-Madinah Al-MunawwarahMadinah Arterial Roadway & Energy Grids
End-to-end supply chain, from design to site reinstatement


